Advantages

Undoubtedly, one of the most important advantages of a wooden house, is the lead time. The entire house can be made "turnkey" even 80% faster than a house built using the traditional method. Our structures can be partially prefabricated, which significantly speeds up the construction process. Another equally important factor is the fact that the ceilings themselves and the structure can be made incomparably faster.

  • The houses we build are set on much lighter foundations, which greatly reduces their cost.
  • Our houses guarantee perfect insulation. This means that the house retains a lot of heat, even after the radiators are turned off. Additionally, in the warmer months, the insulation prevents excessive heat from getting inside.
  • Our houses are ecological and environmentally friendly. Thanks to the self-regulation of humidity and good air circulation, the house also cares about our health.
  • For construction, we use only the best types of wood, which is properly mechanically processed and then impregnated. This makes our structure very durable and resistant to unfavorable and difficult weather conditions.

    Choose your new home

    Essentials

    In order to be able to live in a modular house, it is not always necessary to decide on a building permit, it is not necessary to appoint a construction manager and keep a construction log.

    The investor is only required to submit a notification, which means:

    • notification of construction supervision authorities and the designer who supervises the compliance of the construction with the design on the intended date of commencement of construction works,
    • geodetic designation of the area, and after construction - presentation of the as-built geodetic inventory.

    The house construction application must be accompanied by:

    • plot development plan,
    • architectural and construction design,
    • a declaration on building a house for your own housing needs,
    • a statement that responsibility for managing the construction site is assumed in the event of failure to appoint a site manager.

    Thanks to the simplification of the procedure for reporting the construction of houses up to 70 m2, the formalities themselves last about a month, and the construction can begin immediately after the notification has been delivered to the architectural and construction administration authority.

    Frequently Asked Questions

    Contact

    HomeBox
    Showroom

    58-533 Mysłakowice
    ul. Łokietka 30
    POLAND

    tel. +48 797 907 900

    We work from 8:00 to 16:30
    Monday to Friday.

    Contact form

    Contact form